Cracks & damage
Visible cracking, impact damage, staining, defective finishes and other existing defects are described and photographed.
Condition & evidence schedule
A dated written and photographic schedule creates a practical baseline of visible condition before repairs, nearby works, access, reinstatement or another event that may later make comparison important.
Evidence at a point in time
Once repairs, construction or reinstatement begin, it can become difficult to show which cracks, marks or defects were already present. A condition schedule records the visible state of the agreed areas before that change takes place.
The service is factual rather than adversarial. It does not need to assume that damage will occur or that a dispute will follow. Its purpose is simply to preserve clear evidence of the starting condition.
Focused recording
The coverage is agreed in advance so the record is proportionate to the intended use.
Visible cracking, impact damage, staining, defective finishes and other existing defects are described and photographed.
Walls, ceilings, floors, joinery, external elevations and other agreed elements can be recorded where relevant.
Findings are tied to rooms, elevations or building elements so the evidence can be understood later.
Areas not visible, inaccessible or outside the agreed scope are identified so the schedule is not mistaken for a full building survey.
When it is useful
What you receive
Representative images of the agreed areas and visible condition.
Rooms, elevations or elements are identified so images are not detached from context.
Material observations are described in clear language with the scope stated.
The inspection date provides a defined point in time for any future comparison.
Different from a full survey
The schedule is intentionally narrower than a Level 2 or Level 3 survey. That focus is what makes it useful as a baseline.
Common questions
It is a dated written and photographic record of visible condition within an agreed area or property. It is designed to show what was present at the inspection date before repairs, nearby works, access or another material change.
Not necessarily. A Party Wall schedule is normally prepared within the Party Wall etc. Act process. SurveyAll can prepare an independent factual condition record, but this service is not presented as a Party Wall Award or a substitute for an appointed Party Wall surveyor where the Act applies.
Yes. Existing cracking, staining, damage, finishes and other visible conditions can be photographed, described and located so there is a clear baseline record.
A follow-up inspection can be agreed separately. The usefulness of any comparison depends on access, the original scope, the quality of the baseline record and the nature of the later changes.
No. It records visible condition. Questions of causation, liability or legal responsibility may require further technical or legal assessment.